Connect. Secure. Manage.
Meraki Campus Fabric Readiness
Assess hardware, software and network prerequisites for a cloud-managed campus fabric, confirming current feature availability for the intended environment.
Devices supported
across the UK
Client locations
supported
Traffic handled
at peak time
Average
response time
Average response is not a resolution time or a contractual guarantee. Support scope and response commitments are agreed for each engagement.
Meraki campus fabric readiness checks whether your current network and support team are ready for the proposed design. We review device support, app needs and work still to be done before changes start. The findings can support a full rollout, a staged approach or a simpler design. Unproven assumptions remain visible in the decision.
Dashboard clarity
Structure organisations, networks and permissions around real operational ownership.
Consistent sites
Use repeatable standards without ignoring the differences between locations.
Practical operations
Keep cloud management connected to physical links, users and business services.
Turn the proposed benefit into testable requirements
We ask why the organisation is considering a fabric. The driver might be consistent segmentation across buildings, a difficult access-layer refresh or a need to simplify repeated service changes. We convert those aims into needs that can be assessed. Without that step, a readiness exercise can become a hardware checklist that says little about whether the project is worth doing.
The needs include practical constraints: maintenance windows, app sensitivity, staffing and the expected life of retained equipment. We also identify the stakeholders who can approve changes to authentication, addressing and external routing. A technically compatible network can still be unready if essential decisions have no owner or if a critical app cannot be tested during the proposed migration window.
Standards & partnerships
Confidence in the team behind your network.
Cyber Essentials
Cyber Essentials PlusMCI Network Services is operated by Proxar Ltd. Certifications apply to the certified legal entity and the scope of its certificates. View accreditation information
Inventory hardware, software and management arrangements
The equipment review records exact models, installed software and the roles each device currently performs. We compare the proposed fabric roles with current Cisco support information and relevant licensing. It is important to distinguish devices that can participate directly from devices that may remain as ordinary access or transit equipment outside the fabric’s control functions.
We also examine how the estate is managed today. Local setup, dashboard management, automation scripts and third-party monitoring may overlap. The readiness report identifies where setup authority would change and which tools need adaptation. A device appearing in dashboard is not enough to prove that its current mode supports the proposed rollout or that current working procedures will remain valid afterwards.
A useful starting point
Not sure where to start?
Bring the requirement. We will help you define the engineering work.
Examine the physical and addressing foundations
We review uplinks, cabling, redundancy and the capacity needed between candidate nodes. The proposed transport must support the chosen encapsulation and forwarding design, including relevant MTU needs. Existing faults and unexplained link errors should be addressed before the fabric is introduced. An overlay is not a remedy for unreliable physical infrastructure.
Addressing and resource reservations are checked against the current estate. We identify overlaps, undocumented networks and resources required by the chosen provisioning method. The outcome is a conflict register with owners and remediation options. Discovering an address conflict while a rollout workflow is already changing switches is avoidable when the current network has been investigated properly beforehand.
Different environments. The same care.
Built around the work
your network supports.
Finance, banking and the wider private sector. We start with the systems and people that depend on your connections.
Finance & banking
Market-data paths, routing and provider coordination on clients’ behalf.
Financial-market services ↗Offices & multi-site teams
Reliable access between people, workplaces and business applications.
Office network design ↗Data centres & cloud
Network boundaries, workload connections and operational ownership.
Data centre networks ↗Map authentication and service dependencies
The assessment identifies endpoint populations and their access methods, including devices that cannot use the preferred authentication workflow. We review identity services, certificates, policy ownership and any required integrations. The aim is to understand how users and equipment will receive the intended access, not simply whether an identity platform is listed somewhere in the current design.
Shared services are mapped separately. DNS, DHCP, time, logging, monitoring and app access may cross proposed segmentation boundaries. We record the permitted flows and the team responsible for each service. Where the required information is unavailable, the report states the gap and proposes a way to get evidence. It does not invent an unrestricted temporary rule and call that dependency resolved.
Assess migration and support readiness
We examine how the current network could coexist with the proposed fabric and identify a suitable pilot scope. Gateway moves, external handoffs and legacy endpoints are considered early because they often determine the safe migration sequence. The assessment should show which parts can move independently and which require coordinated changes across several teams.
The operations review covers troubleshooting skills, monitoring, vendor escalation and recovery access. We ask how an engineer would investigate a client that authenticates successfully but cannot reach an app. The team needs visibility across the relevant layers and a clear escalation path. A rollout is not operationally ready if the only person able to understand it is the engineer who built the proof of concept.
Present a prioritised decision rather than a pass label
The report separates blocking issues from improvements that can follow later. Each finding has a business consequence, recommended action and responsible owner. Where a pilot is needed, we define the questions it must answer and the evidence required for acceptance. This gives decision-makers a useful basis for cost, timing and risk discussions.
MCI can use the findings to develop a Meraki campus fabric design or hand them to your internal team. Readiness is assessed against the intended rollout and current support information, not certified as a permanent property of the estate. Changes to hardware, software, identity services or app needs may require parts of the assessment to be revisited before rollout.
Technical references
- Cloud-managed EVPN fabric technical guide — Cisco / Cisco Meraki
- Cloud-managed EVPN fabric installation guide — Cisco / Cisco Meraki
Talk to a specialist
What does your network need next?
Tell us what you are planning, changing or trying to improve. We will help define a practical next step and the engineering scope.
+44 203 196 6566Choose option 1
sales@proxar.co.ukUK-wide service.
Most of our engineers are based in Kent, with a focus on London, Sussex, Essex and Berkshire.
Existing customers should use their agreed support and escalation channels. This form is for service enquiries, not a monitored emergency ticket.
Tell us what you need.
A short outline is enough. Please do not include passwords or sensitive network details.
Thank you. Your enquiry has been submitted.
Please check your name, email and message, then try again.
Your form session expired. Please try again.
Please wait a minute before sending another enquiry.
We could not submit your enquiry. Please call or email us instead.