Cisco & Meraki specialists. Across the UK.
+44 203 196 6566 · option 1sales@proxar.co.uk

Connect. Secure. Manage.

SD-Access Migration

Move a traditional Cisco campus towards SD-Access through a staged plan for site readiness, endpoint transition and rollback at each change boundary.

Cisco Partner since 2009 Projects & ongoing support

Illustrative Cisco and Meraki network rack in a modern office
Your network. Properly considered.Design · Implementation · Support
1,000+

Devices supported
across the UK

20+

Client locations
supported

Nearly 8 Tbps

Traffic handled
at peak time

3 min

Average
response time

Average response is not a resolution time or a contractual guarantee. Support scope and response commitments are agreed for each engagement.

SD-Access migration moves an existing campus towards a Cisco fabric while keeping the business able to operate through the transition. The difficult work is often coexistence: old VLANs, new virtual networks, retained applications and several teams’ change windows. MCI Network Services plans and delivers staged migrations with clear ownership at every boundary, explicit rollback criteria and acceptance tests that reflect the customer’s actual users and devices.

01

Cisco-focused engineering

Design around the platform, traffic and failure behaviour you actually operate.

02

Change with evidence

Use pre-checks, acceptance criteria and a documented route back.

03

Operational handover

Keep the configuration, diagrams and responsibilities understandable after delivery.

Define the destination before the cutover sequence

The approved target design should identify fabric roles, addressing, policy and external handoffs. Without that baseline, a migration can become a series of urgent exceptions that never converge on one coherent architecture. We review the design and record unresolved decisions before turning it into an implementation plan.

The current network is then mapped against the target. We identify which devices can be retained, which require software or hardware changes and which services are outside the migration scope. These distinctions are important for both budgeting and accountability. A campus fabric project does not automatically replace every connected server, firewall or wireless system.

Illustrative enterprise Cisco network rack in a modern office environment
01Enterprise switching and routing, built to be operated.
Cisco PartnerCisco Partner
Cisco MerakiCisco Meraki
ISO 9001Quality management
ISO 27001Information security
Cyber EssentialsCyber Essentials
Cyber Essentials PlusCyber Essentials Plus

MCI Network Services is operated by Proxar Ltd. Certifications apply to the certified legal entity and the scope of its certificates. View accreditation information

Find dependencies that cross migration boundaries

Applications may depend on fixed addresses, local broadcasts, multicast, non-standard discovery or an old gateway location. We work with service owners to identify those requirements and decide how they will be handled during coexistence. Quiet or infrequently used systems should not be ignored simply because they produce little traffic during a short observation period.

Identity and endpoint onboarding are examined separately. Managed laptops, phones, printers and operational devices may need different preparation. Certificates, authentication policies and fallback arrangements must be ready before users move. A successful infrastructure pilot is not sufficient if the endpoint population in the next building is materially different.

Illustrative Cisco and Meraki fibre network rack with structured cabling
02Fibre, switching and the physical path behind the service.

A useful starting point

Not sure where to start?

Bring the requirement. We will help you define the engineering work.

Talk to a specialist

Choose manageable migration units

A migration unit might be a wiring cabinet, floor, building, endpoint class or application group. We choose boundaries that allow useful testing and practical reversal. Moving too much at once makes fault isolation harder; moving too little can prolong complex coexistence. The plan balances those risks against the available maintenance windows.

Each wave has an entry checklist, implementation steps and an acceptance decision. Dependencies on customer teams and external suppliers are named. The schedule includes time for observation and corrective work, not only the configuration commands. This makes it easier to stop a rollout safely when a pilot exposes an unexpected application dependency.

Illustrative Cisco and Meraki equipment in organised data-centre racks
03Data-centre connectivity with clear physical and logical boundaries.

Control routing and gateway ownership during coexistence

Old and new networks must have a clear view of which system owns each subnet and gateway at each stage. We review route exchange, temporary handoffs, DHCP behaviour and return paths. Unplanned overlap can create intermittent connectivity that looks like an endpoint problem but is actually a routing ambiguity.

Temporary Layer 2 extensions or policy exceptions are documented with removal conditions. They may be justified to support a transition, but they should not silently become permanent architecture. The final migration stage includes retiring those arrangements and verifying that the intended fabric boundaries are now the only operational design.

Illustrative Cisco and Meraki industrial network equipment in a plant environment
04Network engineering for operational and industrial environments.

Make rollback achievable

A rollback plan states what will be restored, by whom and within which decision window. It includes external routing and security changes as well as the fabric configuration. We verify that the previous equipment, addressing and management access remain usable for as long as rollback is required.

Some changes cannot be reversed by pasting back a configuration file. Endpoint state, controller provisioning and software transitions may require additional steps. Those limitations are assessed before the cutover. The customer should know when the practical choice becomes forward recovery rather than a quick return to the old network.

Illustrative Cisco and Meraki data-centre network infrastructure
05Network infrastructure designed around the workloads it carries.

Validate users, applications and policy

Acceptance covers onboarding, addressing, shared services, application access and the restrictions that should remain in place. We use representative endpoints from the migration unit rather than relying on an engineer’s test laptop alone. Wireless mobility and specialist traffic are included where they form part of the agreed scope.

The observation period looks for intermittent faults, unexpected policy denials and missing operational visibility. We record the result of each test and identify any accepted limitation. A wave is not complete merely because no user complained during the first few minutes after the change.

Illustrative Cisco and Meraki network rack in a modern office
06The office network: switching, uplinks and structured cabling.

Close the old environment properly

Decommissioning includes obsolete routes, temporary policies, unused credentials and superseded documentation. The operations team receives the new topology and an investigation path for fabric-specific incidents. We also review monitoring, backups and software lifecycle responsibilities so the deployment can be maintained after the project team leaves.

MCI can deliver a complete migration or support an internal team through selected waves. Fabric design and SD-Access troubleshooting are available as related engagements. Provide the current topology, target scope and maintenance constraints to establish a migration plan that the business can approve with a clear understanding of risk.

Illustrative enterprise Cisco network rack in a modern office environment
07Enterprise switching and routing, built to be operated.

Talk to a specialist

What does your network need next?

Tell us what you are planning, changing or trying to improve. We will help define a practical next step and the engineering scope.

+44 203 196 6566

Choose option 1

sales@proxar.co.uk

UK-wide service.
Most of our engineers are based in Kent, with a focus on London, Sussex, Essex and Berkshire.

Existing customers should use their agreed support and escalation channels. This form is for service enquiries, not a monitored emergency ticket.

Tell us what you need.

A short outline is enough. Please do not include passwords or sensitive network details.

Thank you. Your enquiry has been submitted.

We’ll use these details to respond to your enquiry. Please leave out passwords and sensitive network information. Read our privacy notice.