Cisco & Meraki specialists. Across the UK.
+44 203 196 6566 · option 1sales@proxar.co.uk

Connect. Secure. Manage.

Office Network Relocation

Plan the network side of an office move, coordinating Cisco or Meraki equipment, circuits, wireless coverage and application checks at the new location.

Cisco Partner since 2009 Projects & ongoing support

Illustrative enterprise Cisco network rack in a modern office environment
Your network. Properly considered.Design · Implementation · Support
1,000+

Devices supported
across the UK

20+

Client locations
supported

Nearly 8 Tbps

Traffic handled
at peak time

3 min

Average
response time

Average response is not a resolution time or a contractual guarantee. Support scope and response commitments are agreed for each engagement.

Office network relocation is about making the new location usable when the business needs it, while retaining a controlled exit from the old one. MCI plans Cisco and Meraki network moves around circuit readiness, physical installation, application access and the staff transition. The network timetable is coordinated with the office move rather than treated as a task to begin once the furniture has arrived.

A relocation may reuse much of the existing equipment, introduce a new design or combine both approaches. We establish which choice is practical and how the business will operate during the period when the two locations may overlap.

01

A clear requirement

Turn the business need into a practical network scope with visible dependencies.

02

A controlled delivery

Plan implementation, testing and rollback before production changes begin.

03

A supportable result

Leave useful records, ownership and escalation routes behind.

Work backwards from the first working day

The opening date is a business milestone, but several dependencies must be complete before it. Circuits, cabling, power, cabinets, building access and equipment delivery each need an owner and a verified readiness position.

We identify which tasks can be completed while the old office remains live. Preparing the new network early can create time for testing and reduce the amount of work concentrated into the physical move. Where that is not possible, the plan needs a realistic account of the constraints.

A floor plan and occupancy schedule help establish priorities. Partial occupation may be workable, provided the areas in use have the necessary connectivity and do not depend on unfinished work elsewhere in the building.

Illustrative Cisco and Meraki equipment in organised data-centre racks
01Data-centre connectivity with clear physical and logical boundaries.
Cisco PartnerCisco Partner
Cisco MerakiCisco Meraki
ISO 9001Quality management
ISO 27001Information security
Cyber EssentialsCyber Essentials
Cyber Essentials PlusCyber Essentials Plus

MCI Network Services is operated by Proxar Ltd. Certifications apply to the certified legal entity and the scope of its certificates. View accreditation information

Decide what moves and what is built in advance

Reusing equipment can be sensible, but it may prevent the new site from being fully tested until the old site is disconnected. New or temporary equipment may provide more flexibility, with additional cost that should be visible in the comparison.

We assess the condition and suitability of the existing Cisco and Meraki infrastructure rather than assuming it should be moved unchanged. A relocation can expose power, port or wireless requirements that differ from the previous building.

Office network design establishes the new site’s requirements. The relocation plan then determines how equipment, configuration and services reach that target without turning moving day into an unplanned redesign exercise.

Illustrative Cisco and Meraki network operations centre with monitoring displays
02Visibility, monitoring and operational control.

A useful starting point

Not sure where to start?

Bring the requirement. We will help you define the engineering work.

Talk to a specialist

Review the connections that depend on the old address

A new internet connection can affect more than browsing. Public addresses, remote access, supplier allowlists and site-to-site connections may need attention. Some services may depend on information held by an external provider rather than a setting your team can change directly.

We identify those dependencies and their lead times. A circuit being installed does not automatically mean every connected service is ready to use it. Application owners and providers may need to validate the new path before the old one is retired.

Where specialist financial-market connections are involved, the provider handoff and client-side routing are treated as explicit work items. They should not be assumed to behave like ordinary office internet access.

Illustrative Cisco Meraki wireless access point in a modern office
03Cloud-managed wireless for modern workplaces.

Plan the move window and the fallback

The execution plan identifies the equipment sequence, configuration changes and checks needed before staff begin using the new location. It also records who can authorise a change to the plan if a prerequisite is missing or a test fails.

Fallback options depend on the circumstances. They may include retaining service at the old site for longer, using an approved temporary connection or delaying a particular migration step. Those options need to be examined before the old service is disconnected or a circuit contract is ended.

Cutover and rollback planning provides the detailed decision points. A fallback that exists only as “we will work something out” is not a reliable relocation plan.

Illustrative Cisco and Meraki network rack in a modern office
04The office network: switching, uplinks and structured cabling.

Validate the new office before closing the old one

Testing should cover representative staff activities, wired and wireless access, meeting-room services, printing where relevant and connections to external systems. The aim is to verify the working environment, not merely confirm that the equipment has powered on.

We record outstanding issues and distinguish those that prevent occupation from those that can be completed later. The business can then make an informed opening decision rather than discovering the significance of an unresolved item on the first busy morning.

After the move, documentation, monitoring and support information are updated. Old circuits, access rules and equipment are retired through the agreed process, avoiding an indefinite overlap that leaves unnecessary cost or access behind.

Illustrative Cisco and Meraki fibre network rack with structured cabling
05Fibre, switching and the physical path behind the service.

Office relocation questions

Can you support moves outside London?

Yes. MCI provides network services throughout the UK, with particular focus on London, Kent, Sussex, Essex and Berkshire. The delivery plan accounts for the locations, access arrangements and mix of remote and on-site work required by the move.

Should the new circuit be live before moving day?

Where the project allows it, having the circuit available early enables useful testing. The required lead time depends on the provider and building arrangements. We treat circuit readiness as a dependency to verify, not a date to assume from a provisional order.

Can staff work across both offices during the transition?

That can be designed where the applications and connectivity support it. The plan needs to account for shared services, security boundaries and the eventual removal of temporary arrangements. Two occupied offices should not mean two undocumented network states.

What should we send first?

The old and new locations, target dates, floor plans and current connectivity arrangements are useful. Plan an office network relocation early enough for the network requirements to influence the move timetable.

Talk to a specialist

What does your network need next?

Tell us what you are planning, changing or trying to improve. We will help define a practical next step and the engineering scope.

+44 203 196 6566

Choose option 1

sales@proxar.co.uk

UK-wide service.
Most of our engineers are based in Kent, with a focus on London, Sussex, Essex and Berkshire.

Existing customers should use their agreed support and escalation channels. This form is for service enquiries, not a monitored emergency ticket.

Tell us what you need.

A short outline is enough. Please do not include passwords or sensitive network details.

Thank you. Your enquiry has been submitted.

We’ll use these details to respond to your enquiry. Please leave out passwords and sensitive network information. Read our privacy notice.