Connect. Secure. Manage.
Campus Gateway Deployment
Deploy a supported Cisco Campus Gateway design with the required network preparation, access-point settings and validation of client traffic paths.
Devices supported
across the UK
Client locations
supported
Traffic handled
at peak time
Average
response time
Average response is not a resolution time or a contractual guarantee. Support scope and response commitments are agreed for each engagement.
Campus Gateway deployment puts an approved Cisco wireless design into use. We prepare switching, identity and Dashboard setup, then test access-point tunnels and upstream paths. Client policy and real user workflows are checked before handover. The agreed service must work and be supportable, beyond the gateway simply appearing online.
Coverage and capacity
Design Wi-Fi around the spaces, devices and traffic that depend on it.
Secure access
Align authentication, segmentation and guest access with the wider network.
Measured performance
Validate roaming, interference and user experience instead of relying on signal bars.
Confirm the implementation baseline
We start with the approved architecture, appliance choice and access-point inventory. Firmware alignment, supported models and the intended feature set are checked against current vendor needs. The delivery record identifies any prerequisite upgrades and the order in which they must occur. A rollout should not rely on the assumption that a current access point can participate simply because it is already managed through dashboard.
Ownership and access are agreed with the customer. We confirm the destination organisation and networks, authorised administrators and the process for claiming or assigning equipment. The project also identifies the teams responsible for switches, firewalls, identity and client testing. Those contacts are part of the rollout plan because a failed commissioning test may need a coordinated change outside the gateway itself.
Standards & partnerships
Confidence in the team behind your network.
Cyber Essentials
Cyber Essentials PlusMCI Network Services is operated by Proxar Ltd. Certifications apply to the certified legal entity and the scope of its certificates. View accreditation information
Prepare the physical and upstream connections
Installation preparation covers rack space, power, supported optics, uplinks and any required redundancy connection. We check the actual hardware guide rather than treating available ports as interchangeable. Port-channel and switching setup are reviewed on both sides, with clear interface descriptions and a record of the intended physical paths.
The upstream network is prepared for management and client traffic according to the design. We check addressing, VLAN presentation, routing and the necessary permissions before onboarding. The current network must carry the relevant tunnel traffic correctly, including its MTU needs. A successful reachability check is only one prerequisite. It does not replace validation of the complete data path or the client services beyond the gateway.
A useful starting point
Not sure where to start?
Bring the requirement. We will help you define the engineering work.
Configure the dashboard relationships
The gateway and supported access points are assigned to the intended management structure. We configure the relevant wireless-service relationships and check how access points are directed to the gateway arrangement. Where the architecture uses supported network groups or shared profiles, those objects are included in the rollout record with their ownership and scope clearly identified.
We check policy before exposing the service widely. Client addressing, authentication, access restrictions and any supported integrations must correspond to the approved design. Corporate and guest services should not inherit an accidental common boundary during commissioning. The team checks both successful app access and destinations that should remain blocked, rather than treating any working internet connection as a complete policy test.
Different environments. The same care.
Built around the work
your network supports.
Finance, banking and the wider private sector. We start with the systems and people that depend on your connections.
Finance & banking
Market-data paths, routing and provider coordination on clients’ behalf.
Financial-market services ↗Offices & multi-site teams
Reliable access between people, workplaces and business applications.
Office network design ↗Data centres & cloud
Network boundaries, workload connections and operational ownership.
Data centre networks ↗Commission a representative pilot
The first access points and clients are chosen to exercise the important dependencies. We include relevant switch paths, device types and authentication methods, then trace their traffic through the intended termination. The pilot checks fresh connections, address assignment, normal apps and mobility where it is in scope. Results are recorded against the specific software and setup baseline.
If a test fails, we isolate the relevant stage before expanding the rollout. A tunnel issue, an identity rejection and a missing upstream VLAN require different responses. We retain enough evidence to support a precise diagnosis and avoid changing several unrelated settings at once. Material exceptions need approval and an owner. They are not silently passed to the operations team as an unexplained feature of the new service.
Verify resilience and maintenance access
Where the design includes a cluster, we check its expected state and the agreed failure scenarios. We observe client behaviour during loss and restoration of relevant components, with testing constrained by the customer’s maintenance and safety needs. The Campus Gateway resilience service can provide a dedicated assessment when continuity is the main project concern.
Administrative and recovery access are tested independently of ordinary client forwarding. Engineers need a supported route to gather evidence when dashboard network access or part of the upstream network is unavailable. We document how diagnostics are collected, who can use them and when a disruptive action requires approval. The aim is to avoid a rollout that works normally but has no practical support procedure for an abnormal condition.
Complete the configuration and handover record
After rollout, we reconcile the installed estate with the design and retain setup, inventory and acceptance records. Temporary commissioning exceptions are removed or clearly assigned for follow-up. Monitoring is checked with the intended operations team so alerts identify actionable service conditions rather than producing notifications without a responsible recipient.
MCI can deliver this work as part of a new Cisco Campus Gateway project or a staged migration from a current architecture. Share the approved design, site-access needs and proposed change window. We will prepare a controlled delivery sequence and clear completion criteria, including the dependencies that must be ready before the gateway can carry production wireless traffic safely.
Technical references
- Campus Gateway installation guide — Cisco / Cisco Meraki
- Campus Gateway deployment guide — Cisco / Cisco Meraki
Talk to a specialist
What does your network need next?
Tell us what you are planning, changing or trying to improve. We will help define a practical next step and the engineering scope.
+44 203 196 6566Choose option 1
sales@proxar.co.ukUK-wide service.
Most of our engineers are based in Kent, with a focus on London, Sussex, Essex and Berkshire.
Existing customers should use their agreed support and escalation channels. This form is for service enquiries, not a monitored emergency ticket.
Tell us what you need.
A short outline is enough. Please do not include passwords or sensitive network details.
Thank you. Your enquiry has been submitted.
Please check your name, email and message, then try again.
Your form session expired. Please try again.
Please wait a minute before sending another enquiry.
We could not submit your enquiry. Please call or email us instead.