Industrial Network Migration

Plan the replacement of industrial network infrastructure with Cisco equipment, accounting for legacy protocols, vendor constraints and production downtime.

Cisco Partner since 2009 Projects & ongoing support

Illustrative Cisco and Meraki industrial network equipment in a plant environment
Your network. Properly considered.Design · Implementation · Support
1,000+

Devices supported
across the UK

20+

Client locations
supported

Nearly 8 Tbps

Traffic handled
at peak time

3 min

Average
response time

Average response is not a resolution time or a contractual guarantee. Support scope and response commitments are agreed for each engagement.

Industrial network migration changes links that live equipment may depend on. Addresses, multicast traffic, timing and startup order all need care. We plan the move in stages with the site’s operational owners. Each stage has checks and a recovery route, so the old equipment is not removed before those decisions are clear.

01

Cisco-focused engineering

Design around the platform, traffic and failure behaviour you actually operate.

02

Change with evidence

Use pre-checks, acceptance criteria and a documented route back.

03

Operational handover

Keep the configuration, diagrams and responsibilities understandable after delivery.

Establish what is actually being replaced

The scope may involve access switches, a routed backbone, management systems or the boundary between operational and business networks. We find the interfaces, devices and apps affected by each part of the change. An equipment list alone does not show the consequences of moving a cable from one port to another.

We collect current settings, port records, addressing information and supplier constraints. Where records are incomplete, the plan includes an authorised discovery activity rather than treating assumptions as facts. Unknown connections should be investigated or clearly held outside the cutover, not moved simply because they appear on the same old switch.

Illustrative Cisco and Meraki data-centre network infrastructure
01Network infrastructure designed around the workloads it carries.
Cisco PartnerCisco Partner
Cisco MerakiCisco Meraki
ISO 9001Quality management
ISO 27001Information security
Cyber EssentialsCyber Essentials
Cyber Essentials PlusCyber Essentials Plus

MCI Network Services is operated by Proxar Ltd. Certifications apply to the certified legal entity and the scope of its certificates. View accreditation information

Legacy equipment may use unusual negotiation settings, fixed addresses, specific multicast behaviour or protocols sensitive to network changes. We review the supported features of the replacement Cisco platform and the needs of connected systems. A link coming up proves only part of the service.

The migration may also expose differences in security defaults, spanning-tree behaviour or management access. We compare the intended setup with the old live state and identify which differences are deliberate improvements. Copying every historical setting can preserve faults, but removing unexplained settings without investigation can break a legitimate dependency.

Illustrative Cisco and Meraki network rack in a modern office
02The office network: switching, uplinks and structured cabling.

A useful starting point

Not sure where to start?

Bring the requirement. We will help you define the engineering work.

Talk to a specialist

Agree supplier and operational responsibilities

Control-system vendors may need to confirm support, adjust an endpoint or attend acceptance testing. We identify those tasks early and arrange the right contacts for the maintenance window. A network engineer should not be expected to approve a process restart or change an app that belongs to another supplier.

The customer also needs an operational owner who can confirm whether production is in a safe state for the change. The project plan records who may stop the migration, who can authorise recovery and who decides that the process is ready to resume. Those are practical duties, not merely names on a contact list.

Illustrative enterprise Cisco network rack in a modern office environment
03Enterprise switching and routing, built to be operated.

Stage equipment and rehearse the sequence

Preconfiguration can reduce time spent making decisions at site. We check software, management access, port assignments, optics and supported features before rollout. Where representative equipment or a test setup is available, we exercise the connections and behaviour in uses most likely to be affected.

The cutover sequence accounts for dependencies between switches and endpoints. Moving an upstream gateway too early can isolate equipment needed to check later steps. We prepare labelled cable and port schedules, records of the settings and a checkpoint after each meaningful stage. So the team can tell whether to continue or stop.

Illustrative Cisco and Meraki fibre network rack with structured cabling
04Fibre, switching and the physical path behind the service.

Make rollback physically possible

A recovery plan needs more than a copy of the old setup. We consider whether the original equipment remains available, how cables will be returned, whether addresses or endpoint settings have changed and how long restoration will take. Irreversible changes should be identified before the maintenance window is approved.

We also decide how long the old equipment remains protected from disposal or reuse. A spare switch that has already been repurposed is not a reliable rollback option. If the migration changes a broader architecture, recovery may require a different approach from simply reconnecting the previous hardware.

Illustrative Cisco and Meraki equipment in organised data-centre racks
05Data-centre connectivity with clear physical and logical boundaries.

Validate the service with its owner

Post-change tests include network state and the operational workflows agreed with the customer. That may involve device communications, data collection, operator visibility, supplier access and controlled failover. Tests should cover any intended segmentation changes without introducing unapproved probing of sensitive devices.

We compare results with the pre-change baseline and record remaining issues. A plant returning to operation is an important milestone. But it does not on its own prove that every backup path or infrequent maintenance function works. The acceptance record distinguishes completed tests from deferred checks with named owners.

Illustrative Cisco and Meraki industrial network equipment in a plant environment
06Network engineering for operational and industrial environments.

Stabilise and document the new environment

The transition period includes monitoring for link errors, unexpected traffic, device disconnections and configuration drift. We set out when the migration is considered stable and which problems remain within the project scope. Temporary access and migration-specific rules should be removed through controlled changes once they are no longer needed.

MCI can deliver an industrial migration from assessment through handover, or support your team during a defined cutover. The final records connect the new topology, settings and recovery procedures to the actual operational estate, providing a stronger starting point for future resilience reviews and maintenance.

Illustrative Cisco and Meraki data-centre network infrastructure
07Network infrastructure designed around the workloads it carries.

Talk to a specialist

What does your network need next?

Tell us what you are planning, changing or trying to improve. We will help define a practical next step and the engineering scope.

+44 203 196 6566

Choose option 1

sales@proxar.co.uk

UK-wide service.
Most of our engineers are based in Kent, with a focus on London, Sussex, Essex and Berkshire.

Existing customers should use their agreed support and escalation channels. This form is for service enquiries, not a monitored emergency ticket.

Tell us what you need.

A short outline is enough. Please do not include passwords or sensitive network details.

Thank you. Your enquiry has been submitted.

We’ll use these details to respond to your enquiry. Please leave out passwords and sensitive network information. Read our privacy notice.