Cisco & Meraki specialists. Across the UK.
+44 203 196 6566 · option 1sales@proxar.co.uk

Connect. Secure. Manage.

Wi-Fi 7 Migration

Stage a migration from older wireless generations to Cisco Wi-Fi 7, preserving required client access while validating new radios and network dependencies.

Cisco Partner since 2009 Projects & ongoing support

Illustrative Cisco and Meraki fibre network rack with structured cabling
Your network. Properly considered.Design · Implementation · Support
1,000+

Devices supported
across the UK

20+

Client locations
supported

Nearly 8 Tbps

Traffic handled
at peak time

3 min

Average
response time

Average response is not a resolution time or a contractual guarantee. Support scope and response commitments are agreed for each engagement.

Wi-Fi 7 migration should improve the wireless service without losing the device compatibility, access controls or support knowledge the organisation already depends on. MCI Network Services plans phased Cisco and Meraki migrations that connect the new access-point capability to the wired network, identity services and real client workflows. The approach is to establish a supported target, prove it with representative users and expand only when the evidence supports the next stage.

01

Coverage and capacity

Design Wi-Fi around the spaces, devices and traffic that depend on it.

02

Secure access

Align authentication, segmentation and guest access with the wider network.

03

Measured performance

Validate roaming, interference and user experience instead of relying on signal bars.

Inventory the service being replaced

The starting point is an accurate view of access points, management platforms, software and wireless services. We also identify important clients, including older or specialist equipment that may not be visible during a normal laptop-focused review. Device age alone is not the deciding factor; the assessment records what each group needs and which supported security and radio capabilities it can use.

Existing problems are documented before migration. An unreliable application, a congested circuit or a poor switch uplink should not be attributed to the new wireless platform merely because it becomes visible during the cutover. Baseline evidence helps distinguish an inherited issue from a migration defect and provides a meaningful way to assess whether the project has delivered the improvement the customer expected.

Illustrative Cisco Meraki wireless access point in a modern office
01Cloud-managed wireless for modern workplaces.
Cisco PartnerCisco Partner
Cisco MerakiCisco Meraki
ISO 9001Quality management
ISO 27001Information security
Cyber EssentialsCyber Essentials
Cyber Essentials PlusCyber Essentials Plus

MCI Network Services is operated by Proxar Ltd. Certifications apply to the certified legal entity and the scope of its certificates. View accreditation information

Agree the target architecture and exceptions

We confirm the supported access-point, firmware and management combination, together with addressing, authentication and forwarding policy. A move to Wi-Fi 7 does not automatically require changing every aspect of the network. Where the architecture is also changing, its consequences are made explicit so the project does not combine several major transitions without a clear test and recovery plan.

Legacy clients may require a separate compatibility arrangement, an endpoint update or replacement. We document the chosen treatment and its security boundary. Exceptions should be limited to a genuine requirement and reviewed over time, rather than becoming an indefinite reason to preserve an unsuitable configuration for all users. The readiness findings determine which prerequisites must be completed before any production area is moved.

Illustrative Cisco and Meraki network rack in a modern office
02The office network: switching, uplinks and structured cabling.

A useful starting point

Not sure where to start?

Bring the requirement. We will help you define the engineering work.

Talk to a specialist

Prepare switching, cabling and physical work

The new access points are checked against installed switch ports, power budgets and uplink capacity. We identify any cabling tests, supply changes or mounting work required. These tasks are scheduled before the wireless cutover so that engineers do not discover a power limitation only after removing the equipment that previously served the area.

The installation plan records locations, labels and access requirements. A replacement in the same ceiling position still needs validation against the radio design and the new device’s antenna characteristics. Facilities constraints and safe working arrangements are included in the scope. The customer should understand which work is remote configuration, which requires a site visit and which depends on a separate cabling or installation contractor.

Illustrative Cisco and Meraki network operations centre with monitoring displays
03Visibility, monitoring and operational control.

Pilot a meaningful part of the estate

A pilot includes representative clients and applications, with fresh onboarding as well as established connections. We test security, addressing, roaming and the intended use of newer features. The wireless client compatibility testing service provides a structured way to record results where the device population is a major project risk.

We select a pilot area that is manageable without being artificially easy. A quiet room with one current laptop cannot establish readiness for a busy floor with voice devices and older endpoints. The test report records conditions, versions and exceptions. Material issues are resolved before expansion, or accepted explicitly with a clear impact and owner rather than hidden in a general statement that the pilot was successful.

Illustrative Cisco and Meraki equipment in organised data-centre racks
04Data-centre connectivity with clear physical and logical boundaries.

Sequence coexistence and rollback

During a phased rollout, old and new wireless areas may coexist. We plan network names, security, radio use and mobility boundaries so users are not left to discover incompatible transitions themselves. A familiar SSID does not guarantee identical authentication or session behaviour across two different operating arrangements. Those boundaries are part of the acceptance tests.

Rollback must remain possible at each stage. We retain the configuration and equipment needed to restore the previous service where that is the agreed recovery method. The plan accounts for firmware, inventory assignment and switch-port changes, not merely the physical replacement of an access point. Stop conditions and decision ownership are set before the window, allowing the team to pause a rollout that is not meeting its agreed criteria.

Illustrative Cisco and Meraki fibre network rack with structured cabling
05Fibre, switching and the physical path behind the service.

Close the project with an operational baseline

After deployment, we reconcile the installed inventory and configuration with the target design. Temporary exceptions are removed or assigned a review date, and monitoring is updated for the new estate. Handover includes known client limitations, test evidence and the responsibilities for future firmware and policy changes. This makes the migration a controlled service transition rather than a collection of equipment swaps.

MCI provides Cisco and Meraki network services throughout the UK, including London and the surrounding counties. Share the current wireless inventory, site schedule and applications that cannot tolerate an unplanned interruption. We can prepare the migration scope and delivery sequence, using the Wi-Fi 7 service overview as a starting point for deciding which capabilities are relevant to the business rather than assuming every available feature must be enabled immediately.

Illustrative Cisco Meraki wireless access point in a modern office
06Cloud-managed wireless for modern workplaces.

Technical references

Illustrative Cisco and Meraki network rack in a modern office
07The office network: switching, uplinks and structured cabling.

Talk to a specialist

What does your network need next?

Tell us what you are planning, changing or trying to improve. We will help define a practical next step and the engineering scope.

+44 203 196 6566

Choose option 1

sales@proxar.co.uk

UK-wide service.
Most of our engineers are based in Kent, with a focus on London, Sussex, Essex and Berkshire.

Existing customers should use their agreed support and escalation channels. This form is for service enquiries, not a monitored emergency ticket.

Tell us what you need.

A short outline is enough. Please do not include passwords or sensitive network details.

Thank you. Your enquiry has been submitted.

We’ll use these details to respond to your enquiry. Please leave out passwords and sensitive network information. Read our privacy notice.